Two kinds of progress separated in the state’s follow-up

Bakersfield reduced a petroleum-tank inspection backlog substantially, but documented follow-up on hazardous-waste violations moved much less, a comparison of CalEPA’s initial evaluation and its latest public progress review shows. The distinction separates visiting a facility from establishing that cited problems have been corrected.

The January 9, 2026 evaluation identified 118 of 139 aboveground petroleum facilities outside the city’s two-year inspection schedule. Inspectors completed 35 during that evaluation, leaving 83. Separately, 242 of 1,010 hazardous-waste violations lacked a documented return to compliance as of July 24, 2025. Those are different measures: facilities awaiting inspections and violations awaiting documented resolution.

The inspection standards also matter. Bakersfield’s local schedule calls for all covered aboveground petroleum facilities to be inspected every two years. The state evaluation distinguishes that policy from the three-year requirement for spill-prevention-plan inspections at facilities storing at least 10,000 gallons. Accordingly, the initial 118-facility backlog should not be described as 118 violations of that narrower state inspection interval.

In the follow-up, state reviewers counted 30 overdue petroleum facilities on September 10, 2026, and 230 hazardous-waste violations without documented resolution on September 2. Compared with the initial figures, the respective reductions were 88 facilities, or 74.6 percent, and 12 violations, or 5.0 percent. These calculations describe net changes in the reported counts; they are not an independently verified tally of new inspections.

The city’s response and the state’s assessment

The city told reviewers that inspectors were following up at facilities and working toward compliance. CalEPA accepted staff-training documentation and considered the single-walled-tank temporary-closure deficiency corrected. It also credited progress for larger petroleum facilities: only one of 28 remained outside the three-year inspection requirement, and that portion was considered corrected.

Eight deficiencies and six incidental findings remained for the next progress report, due December 18, 2026. The follow-up is listed in the public CERS directory with a September 16 disposition date and September 17 upload. Its footers retain the original January date; the September database-review dates establish the currency of these results.

Earlier closure did not end the underlying oversight problem

The historical comparison reaches beyond this year’s backlog. The October 2021 evaluation had already identified insufficient follow-up on hazardous-waste violations: 34 of 134 lacked documented return to compliance for January 2018 through December 2020. It required a tracking spreadsheet with inspection and violation dates, scheduled and actual correction dates, and an explanation of enforcement when compliance had not been obtained.

That earlier report also required better documentation of the factual basis and corrective action for hazardous-waste citations. For petroleum tanks, it identified inconsistent follow-up and directed the city to prioritize hazards. Its recommendations called for reviewing fees, staffing and the allocation of resources to inspection and enforcement. These were operational requirements and recommendations, extending beyond clearing a particular list of overdue visits.

CalEPA’s December 13, 2024 closing letter provides an important check against suggesting those earlier findings remained continuously open. It said eight of nine outstanding deficiencies were corrected and all three incidental findings resolved. The remaining issue—identifying all hazardous-waste facilities within the city’s jurisdiction—would carry into the next evaluation. The overall rating remained satisfactory with improvement needed. The new evaluation expressly describes recurrence of petroleum inspection and follow-up deficiencies after earlier correction.

What the comparison establishes—and what it cannot

The initial 2025 evaluation documented a hard-drive failure during a software transition, lost inspection and enforcement records, and inadequate staffing and resources. Those findings supply context, but do not establish that the crash caused each missing compliance entry. Missing documentation also does not prove every underlying condition continued unchanged.

This analysis compares the published evaluation, the city’s responses embedded in the state follow-up, and the earlier evaluation and closing letter. It does not identify individual businesses as currently violating requirements, infer pollution from an inspection backlog, or claim that the two percentage reductions measure equivalent risks. The public accountability finding is narrower: substantial inspection progress coexisted with much smaller progress in documenting resolution of the separately tracked hazardous-waste violations.

Sources and further reading

CalEPA final Bakersfield evaluation — January 9, 2026 ↗

CalEPA response to Bakersfield’s first progress report — September 16, 2026 ↗

CalEPA Bakersfield evaluation — October 18, 2021 ↗

CalEPA closing letter for the 2021 evaluation — December 13, 2024 ↗

CERS public regulator document directory ↗

Photograph license ↗